AMYRIS BIOSCIENCES TI

The project is located at 5885 Hollis Street in Emeryville, California. The project consists of 23,000 SF on the 1st floor and 11,000 SF on the 2nd floor of the existing office space to be converted to accommodate the existing laboratory program expansion on the North side of the building. The building has 4 floors above grade. There are also two levels of below grade parking. Floors 1 through 4 are enclosed office/lab tenant space.

The project delivery method is design-bid-build. M+ is the engineer of record for the project.

MEYERS+ is providing Mechanical, Electrical, Plumbing & Fire Protection services.

ENGINEERING FEATURES

M+ designed the MEP-FP system to support the existing Fermentation Lab renovation and expansion of approximately 32,000 sq. ft. on the 1st and 10,700 sq. ft on the 2nd floor. The existing infrastructure included lab supply, lab exhaust, RO/DI water, and supplemental chilled water was extended into the new areas to serve the new Bio Analytics Lab, Biology Lab, Cold Room, Fermentation Lab, GlaM+ designed the MEP-FP system to support the existing Fermentation Lab renovation and expansion of approximately 32,000 sq. ft.

on the 1st and 10,700 sq. ft on the 2nd floor. The existing infrastructure included lab supply, lab exhaust, RO/DI water, and supplemental chilled water was extended into the new areas to serve the new Bio Analytics Lab, Biology Lab, Cold Room, Fermentation Lab, Glass Wash, Chromatography Lab.  ss Wash, Chromatography Lab. 

OWNER Wareham Development
ARCHITECT DGA
CONTRACTOR DPR Construction