AVIA LABS AT MILLBRAE STATION

The project is located at 210 Adrian Road in Millbrae, California.

The project is an 6-story, 263,000 GSF core and shell life-science building that will support approximately 50% laboratory and 50% office spaces.  The building will contain 4 levels of parking: 1 level below grade and 3 above grade.

The project is seeking LEED Gold and Fitwell certification.

The project delivery method is design-build, where MEYERS+ provided the Basis of Design for the procurement of mechanical and electrical design-build subcontractors and is providing peer reviews during the design and construction phases.

MEYERS+ is providing Mechanical, Electrical, Plumbing & Fire Protection services.  

ENGINEERING FEATURES

This project is electively pursuing an all-electric design path and will feature a rooftop PV array.  The HVAC systems include heat recovery runaround loops to capture the heat in the lab exhaust air systems and beneficially re-use the energy to heat the building.

OWNER Longfellow Real Estate
ARCHITECT Flad
CONTRACTOR Level 10 Construction